Toronto Data Center – TOR-3

High-density power in Toronto’s west end
(431 Horner Ave)

The eStruxture TOR-3 Data Center offers flexible colocation options that allow you to house your own servers and equipment within the data center, ensuring your IT infrastructure can be up and running in a fraction of the time it would take to set up in-house.

Pure Compliance for Total Peace of Mind

compliant and built to meet or exceed all Tier II standards

Ultimate Redundancy for 100% Uptime

with 100% uptime guarantee, which is backed by an industry-leading service-level agreement (SLA)

Reliable Service

with 24x7x365 technical support

High Power Density Available

with a total capacity of 5MW

POWER

  • N+1 mechanical infrastructure
  • All components are N+1 redundancy on UPS
  • 2.5MW Diesel, 2.225MW Diesel and 2MW Natural Gas
  • Cabinet power is 3 phase 208V 30A – monitored through in-cabinet PDU

COOLING

  • N+1 redundancy on all mechanical components
  • Data Hall 1 & 2 with closed-loop glycol CRAC units with individual dry coolers on the roof
  • Data Hall 3 with centralized chiller units with air handling units (also available with free cooling mode)

SECURITY

  • Centralized card access control system with dual-factor biometric authentication
  • Full access control system with proximity card readers
  • Advanced video surveillance, 90 days of video retention

Want to learn more about our TOR-3 Data Center?

Schedule A TourDownload TOR-3 Data Sheet